Web Analytics Made Easy - Statcounter

Seibert Road Temporarily Closed for MetroLink Construction at Scott Air Force Base

Facebook
Twitter
LinkedIn

  • Published
  • By Senior Airman Madeline Baisey

  • 375th Air Mobility Wing Public Affairs

Temporary Road Closure of Seibert Road due to MetroLink Construction

 

Beginning the week of February 12, between 9 a.m. to 2 p.m., there will be intermittent, 15-20 minute, closures of all lanes (East and West bound traffic) of Seibert Road for the placement of steel beams for a rail and bike bridge over Seibert Road.  During these road closures, Old IL-158 will be open to traffic entering/exiting Shiloh Gate.

 

At this time, the hours of operation for both the Belleville and Cardinal Creek Gate will remain the same:

Belleville Gate (Open Mon-Fri from 5:30 a.m. to 8 p.m., Sat-Sun 5:30 a.m. to 6 p.m.)

Cardinal Creek Gate (Open Mon-Fri from 6 to 8 a.m. inbound traffic only, Mon-Fri 3 to 5 p.m. outbound traffic only, closed Sat-Sun).

Both gates are closed on all holidays and AMC Family Days.

Source link

Picture of Caleb Alexander

Caleb Alexander

Sign up for our Newsletter

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit